STFA Deniz İnşaat Continues its Projects in Qatar with Berth 6
STFA Deniz İnşaatı İnşaat San ve Tic. A.Ş has signed a contract with Fluor Mideast Limited for Common Lean LNG Loading Facilities Berth No: 6 in Ras Laffan, Qatar on 02 November 2007
Qatargas Operating Company Limited is developing an integrated lean LNG storage and loading facility at Ras Laffan Industrial City located on the northeast coast of Qatar.
Phase 6 of this project consists of adding a new dock facility for loading lean LNG from LNG tanks. Phase 6 specifically includes:
A 580 m long LNG Berth 6 Abutment and Tie-in to New Main Breakwater
LNG Loading Platform Block Foundation, with Cast Reinforced Concrete (CRC) cap.
Four (4) Breasting Dolphins on Block Foundations with CRC caps equipped with fenders and quick release hooks (double) with capstan.
Eight (8) Mooring Dolphins on Block Foundations with CRC caps equipped with quick release hooks (quadruple) with capstan.
Catwalks, platforms and ladders
Berth 6 Marine Flare Piled Support Platform Structure.
Installation of Loading Platform and Breasting Dolphin fenders
Installation of Quick Release Hooks
The value of the project is 144,870,831 USD and the period for completion of the Works will be 16 months.